Complete renovation of the school’s secondary gymnasium. Work entailed installation of a fire sprinkler system bringing the facility up to fire code. Included full modernization of the facility’s locker rooms, replacement of the sports flooring, bleachers and fire detection equipment. All work was expedited to be performed between spring break

25,000-square-foot renovation of the existing premier Private High School’s Science and Art Center to modernize the facility and bring it to post-secondary standards. The programing for the facility included Science Laboratories, Digital Laboratories, Art Rooms, a Sound Studio, Fabrication Shops for Metal, Wood and Robotics, and all new faculty spaces. The

10,000-square-foot renovation to add additional classrooms, music room and martial arts room. Work consisted of a full-scale tenant improvement in the downtown Phoenix mid-rise urban campus. Additional work included the occupied renovation of several existing classroom areas and modernization of campus restroom facilities. All work was completed between spring break

This facility is a new 13,700-square-foot, four-bay fire and rescue station developed on 3.1 acres of land in southeast Gilbert. The station includes living quarters, exercise room, kitchen, dispatch room, offices, a decontamination room and apparatus space to support up to four engines and/or rescue equipment. The ICF & masonry

New learning facility for the City of Phoenix. The building was built on the site of an old grocery store that had burned down resulting in soil contaminated with elevated levels of arsenic that required complete abatement. The City was highly satisfied with our performance on this award-winning project.

The expansion of the existing Healthway’s secured facility was necessary to facilitate the health-conscious group’s ability to provide a fun and flexible working environment for their colleagues. The 13-phases of construction touched everyone in the occupied facility as colleagues were shifted to their new workstations. Conveniences include a recording and

Willmeng has held this contract since 2011, as a prime general contractor. The work under this IDIQ contract includes construction, repair, rehabilitation and alteration services for a wide variety of project types. To date, the number of Job Orders processed is 32 and the total contract value has exceeded: $3,153,492.

With high-level security and safety requirements, American Airlines selected Willmeng to perform design and construction services for projects beginning in 2016. Projects include renovations and remodels at facilities located within Phoenix Sky Harbor International Airport. These projects are completed in critical and occupied facilities within the airport. Stringent requirements make

The project consists of a 65,000-square-foot manufacturing facility for HVAC Equipment. Construction included a heavy electrical scope and installation of three bridge cranes. Coordination consisted of raising the roof approximately 25 feet to accommodate the end user who needed 30 tons of crane area. The project was initially over budget,

Hamilton Sundstrand is a global corporation with various business units that design, manufacture and support technologically advanced aerospace and industrial products for worldwide markets. The company provides electric power generating, distribution, management and control systems. Willmeng Construction was invited by RREEF to join the Design/Build team to meet the project