Size: 6,000 SF Project Description: Raymond James is a first generation build out of 6,000 square feet in the heart of Tempe. Walking into the lobby sets your expectations for the suite, with Travertine tile, pendant lights and high-end wall covering. A view from the lobby into the glass enclosed conference room
READ MORE

Size: 45,266 SF Project Description: Clear Call is a rapidly growing operation that needed new space as cost effectively as possible with a very open concept to house a high density call center. The design focused on making a large room visually interesting by exposing the 30’ tall structure and adding vibrant
READ MORE

Size: 9,292 SF Project Description: What was once was a second generation space is now graced with stone, granite and custom wood columns and paneling. When construction started, the only existing elements were the exterior and demising walls and the ceiling. Upon completion a reception area, conference rooms, large breakroom, copy areas
READ MORE

Size: 56,168 SF Type of Contract: Cost Plus Construction Team: James Murphy Project Description: Peddler’s Sons Produce is a 56,168 SF conversion of the existing building from typical warehouse space to a refrigerated and freezer food storage and distribution facility. The new facility for Peddler’s Sons allows for the expansion of this local
READ MORE
Global Tranz

Size: 70,347 SF Project Description: GlobalTranz is a rapidly growing operation that needed new space as cost effectively as possible with a very open concept to house a high-density call center. This innovative 70,347 SF tenant improvement project was assembled from a second generational space by combining two facilities into one
READ MORE

Infusionsoft HQ TI Building #6 Size: 92,000 SF Project Description: The new state-of-the-art corporate headquarters building for Infusionsoft includes employee amenities such as a library, game room, football field/sports court, lactation room, quiet rooms, and an outdoor patio/grill area. Open architecture invites close collaboration and serves to inspire the Infusionsoft team to
READ MORE
Willmeng | VW Fuel Island Canopy

Size: 19,000 SF Type of Contract: Lump Sum Preconstruction Services: No Construction Team: Ken Carter, James Murphy, Isam Ghandour Project Description: Construction of a new pump fuel canopy structure, fuel distribution for same, installation of the above ground storage tanks, and construct associated utility infrastructure and site work including paving, retention basin, and security berm.
READ MORE
Enterprise Vehicle Storage Facility

Size: 23 acres, 8,000k - 10,000 SF Type of Contract: Cost Plus Construction Team: Ken Carter, Isam Ghandour Project Description: New metal building with insulated panels, built-out office building of approximately $8,000k - 10,000SF. The project features Conference, Break, Storage, Mail Room functions, 3-4 Service Bays for light vehicle servicing (vehicle lifts and equipment by
READ MORE
Heart & Rhythm

Size: 3,448 SF Delivery Method: Design Build Project Description: This Cardiology Practice's build-out included eight exam rooms, dual treadmill room, nuclear medicine exam room, five physician/business offices and ample support space. Additional office features included custom wood slat work on thickened walls; curved soffits, walls, and solid surface reception desk; pendant
READ MORE
Insys

Size: 35,000 SF Delivery Method: Design Build Project Description: Occupying 35,000 square feet, the new headquarters for INSYS comprises the entire first floor of building #2 at the Allred Park Place Phase 1A in Chandler, AZ. Allred Park Place offers class A office space in a campus setting that is conveniently
READ MORE
Allred Park Place

Size: 99,000 SF Delivery Method: Design Build Preconstruction Services: Yes Significant Challenges: Site work with the phasing of the office complex. Project Description: Building 4 - 99,000 square foot, 2-story shell office building. Tilt up construction with complete infrastructure and sitework. Owner: Douglas Allred Company Architect: Balmer Architectural Group
READ MORE

The adage “there is no substitute for experience” accurately describes Mike. Born in Hawthorne, Nev., and raised in Carson City, Mike spent his high school summers working in the construction industry. His jobs included underground pipe installation and cabinetry work in the area casinos. Mike moved to Arizona in 1978

READ MORE

Growing up in the northern California city of Walnut Creek, Thomas “TJ” Jarvis landed his first job at the age of 11 tossing newspapers for the Contra Costa Times. He made $9 a day, and earned every dime. Getting up early each day and completing his route helped forge a

READ MORE

James Murphy was born and raised in the expanses of the West and Southwest. If it’s happening in the great outdoors, chances are that’s where you will find Willmeng’s President and CEO when he is not working. James was born in Corpus Christi, Texas, and grew up in the West.

READ MORE

Isam Ghandour is a rare breed in the construction industry. From the start, he set out to become a building professional. He began his career by earning his Bachelor of Science degree in architecture engineering from the University of Khartoum in Sudan. He worked as an architect for one year

READ MORE
Fighter Country

Willmeng Construction was recently recognized for the renovation of a fire station at Luke Air Force Base. The work was completed through a partnership with Fighter Country, a nonprofit organization supporting families and programs no longer receiving government funding at Luke. “Community involvement is a significant part of the Willmeng

READ MORE
NAIOP Arizona Golf Tournament

It’s known as one of the most entertaining rounds of golf in Phoenix every year, and the 2015 NAIOP Arizona Golf Tournament at Talking Stick Golf Club certainly didn’t disappoint. Willmeng Construction was one of dozens of Tee Sponsors at the sold out event, with nearly 300 people from top

READ MORE
NAU Reception

NAU North Valley campus encompassed an improvement of 66,662 SF of a multi-tenant office building into a cohesive satellite collegiate facility. The renovation included a welcoming lobby with soaring ceiling heights, innovative classrooms, observation rooms, spacious multi-use rooms, a computer lab, faculty office space, support areas such as copy rooms,
READ MORE
James Murphy 40 under 40

James Murphy, President of Willmeng Construction was among 40 individuals recognized by the Phoenix Business Journal (PBJ) for their outstanding leadership and for having a positive impact on their communities. The 40 honorees under the age of 40 represent for-profit and non-profit organizations in the Valley. This years’ honorees bring

READ MORE
Centrica

Centrica, an adaptive reuse project in the city of Mesa’s Fiesta District is officially home to Santander Consumer USA Holdings, Inc., a subsidiary of global retail banking giant Banco Santander. Willmeng Construction, along with Nelsen Partners designed the environmentally conscious state-of-the-art project with abundant parking and redundant fiber optic backbone

READ MORE

NAIOP Arizona awarded Willmeng Construction the 2015 Tenant Improvement Contractor of the Year at the Best of NAIOP awards.

READ MORE
Allred Park Place

NAIOP’s Best of 2014 awards honored Douglas Allred Company and named their development of Park Place Building No. 5 as Best Spec Office Development of the Year. Shortly after the shell building’s completion, this project was successfully leased for Infusionsoft’s future expansion.

READ MORE
ranking arizona awards

We are honored to have been named #1 Tenant Improvement Contractor for 2015 according to Ranking Arizona’s public opinion poll. Thank you for your votes and support!

READ MORE

Jessica Zygmont grew up in Bay City, Mich., and earned a Bachelor’s in Accounting and Finance from Western International University. At a young age, thoroughly enjoying an accounting position only further confirmed how natural a fit finance was for her, and she began to climb through the ranks. She joined

READ MORE

As the director of client and pre-construction services at Willmeng, Keyvan Ghahreman works to further develop and deliver client service strategies. Often described as level-headed, easy-going and collaborative, Keyvan lives out Willmeng’s “Make It Happen” philosophy daily by utilizing a unique blend of knowledge, skills, and integrity to provide an

READ MORE
Digital Realty Trust

Project Description: These projects included an exterior facade upgrade, data center remodel and improvements, exterior upgrades, loading dock upgrades, office remodel, and several interior upgrades. DRT Building Facade Upgrade DRT Containment Curbs DRT Gate Modifications DRT 3rd Floor Office Remodel DRT Sunguard DRT Loading Dock Upgrades DRT Common Area Upgrades DRT
READ MORE

Growing up in the small town of Great Bend, Kansas, Cody Phelan demonstrated a ‘can-do’ attitude and tremendous work ethic early on. At nine years old, he was diagnosed with Legg-Calve-Perthes Disease, a hip disorder causing bone loss and deformity of the hip socket. He spent a month in the

READ MORE
SHARE

Home