Willmeng broke ground last month on a new 64,000-SF high school and middle school campus in the North Valley. Caurus Academy, located in Anthem, will now have a high school located right down the street that their K-8 students can feed into. The new facility will include a new 11-acre site with a

Working within the aviation environment requires careful planning and coordination with multiple stakeholders. Special attention must be paid to maintaining airside/landside separation, complying with airport security requirements and assuring that construction has no impact upon existing operations. Willmeng’s team of builders is well-suited to working in such environments and has enjoyed

ASM is a leading supplier of semiconductor process equipment for wafer processing. Throughout Willmeng’s ongoing relationship with ASM, we have completed five renovation projects located at their local Clean Room Center in Phoenix. Such work has included removal and replacement of tools in Class 100 or higher areas.

Located at The Reserve at San Tan, the Orsett owned property is a new 104,000-square-foot concrete tilt office building and is mezzanine ready for up to 168,000 square feet total. This new building is the fourth in the office park and includes CMU accents and a steel entry canopy/trellis with

Flagship Credit is a 40,000-square-foot Class-A Tenant Improvement build out. Improvements included redesigned lobbies, bathrooms, breakrooms, game rooms, kitchen and office space modernized and finished with unique accents.

The project entailed a new metal building with insulated panels, and a built-out office building of approximately 10,000 square feet. The project includes conference rooms, breakrooms, storage space, mailroom functions, four service bays for light vehicle servicing, 12,000-gallon above grade fuel storage tank, shade canopies, secured masonry fencing along the

The Willie Itule project consisted of a 70,000-square-foot warehouse renovation including the addition of 13,000 square feet of new office space. Work also included coordination to accommodate 30,000 square feet of owner provided cooler/freezer installation. Willmeng performed significant work that was required to accommodate repairs and grinding of the existing

The largest local ice manufacturer desired to double their production capabilities. Work required occupied phase building expansion to minimize disruption to Ice King’s operations during construction. Willmeng facilitated the addition of two new ice machines and two new bagging lines. Work included complete replacement of the critical Reverse Osmosis equipment,

Complete renovation of the school’s secondary gymnasium. Work entailed installation of a fire sprinkler system bringing the facility up to fire code. Included full modernization of the facility’s locker rooms, replacement of the sports flooring, bleachers and fire detection equipment. All work was expedited to be performed between spring break

25,000-square-foot renovation of the existing premier Private High School’s Science and Art Center to modernize the facility and bring it to post-secondary standards. The programing for the facility included Science Laboratories, Digital Laboratories, Art Rooms, a Sound Studio, Fabrication Shops for Metal, Wood and Robotics, and all new faculty spaces. The

10,000-square-foot renovation to add additional classrooms, music room and martial arts room. Work consisted of a full-scale tenant improvement in the downtown Phoenix mid-rise urban campus. Additional work included the occupied renovation of several existing classroom areas and modernization of campus restroom facilities. All work was completed between spring break

This facility is a new 13,700-square-foot, four-bay fire and rescue station developed on 3.1 acres of land in southeast Gilbert. The station includes living quarters, exercise room, kitchen, dispatch room, offices, a decontamination room and apparatus space to support up to four engines and/or rescue equipment. The ICF & masonry

New learning facility for the City of Phoenix. The building was built on the site of an old grocery store that had burned down resulting in soil contaminated with elevated levels of arsenic that required complete abatement. The City was highly satisfied with our performance on this award-winning project.

The expansion of the existing Healthway’s secured facility was necessary to facilitate the health-conscious group’s ability to provide a fun and flexible working environment for their colleagues. The 13-phases of construction touched everyone in the occupied facility as colleagues were shifted to their new workstations. Conveniences include a recording and

Willmeng has held this contract since 2011, as a prime general contractor. The work under this IDIQ contract includes construction, repair, rehabilitation and alteration services for a wide variety of project types. To date, the number of Job Orders processed is 32 and the total contract value has exceeded: $3,153,492.

With high-level security and safety requirements, American Airlines selected Willmeng to perform design and construction services for projects beginning in 2016. Projects include renovations and remodels at facilities located within Phoenix Sky Harbor International Airport. These projects are completed in critical and occupied facilities within the airport. Stringent requirements make

The project consists of a 65,000-square-foot manufacturing facility for HVAC Equipment. Construction included a heavy electrical scope and installation of three bridge cranes. Coordination consisted of raising the roof approximately 25 feet to accommodate the end user who needed 30 tons of crane area. The project was initially over budget,

Hamilton Sundstrand is a global corporation with various business units that design, manufacture and support technologically advanced aerospace and industrial products for worldwide markets. The company provides electric power generating, distribution, management and control systems. Willmeng Construction was invited by RREEF to join the Design/Build team to meet the project

Willmeng Construction performed full-scale remodels to multiple 24-hour Walmart Supercenters located throughout the Phoenix Metropolitan area. The renovations of the 200,000 square foot stores include the complete remodel of the main sales floor and all administrative office and support areas, a new pharmacy, a completely remodeled auto service center, a

Willmeng performed construction services to 136,000 square feet of space at multiple warehouse locations throughout the Phoenix area. These projects included remodels to all fresh areas including new freezers and coolers, new entry and exit vestibules, rework ADA parking areas, pharmacies, mezzanine offices and break rooms, downstairs offices, snack bars,

The Management Office is a 1,069 square foot space with one office, a conference room and workspace for three cubicles. The office has a grand entry with a 4′ x 9′ glass door and 26″ sidelites at each end, plus finishes throughout, including flooring, millwork (quartz tops, tile backsplashes, and wood

3,000-square-foot tenant improvement to create an advanced pediatric sleep lab facility. Work included the construction of four sleep rooms including integrated restrooms and showers. The facility includes audiovisual infrastructure to allow for monitoring of sleep studies and security of patients and families. Work required significant upgrades to the mechanical and

Complete renovation of the Town of Paradise Valley’s Public Safety Communications and the refurbishment of an existing structure for use as an electronics equipment room. Willmeng finished the project on time and within budget, while ensuring the Police Department and 911 Call Center stayed open and operable. The project was

In 2018, Willmeng Construction completed 30,877 square feet of construction on the expansion of BASIS Flagstaff, a nationally ranked K-12 charter school. The project included a ground-up two-story high school wing, a ground-up kindergarten wing, the addition of a new gym and theater and some renovations to the existing building and parking lot. “In

Representing the Valley’s continued industrial resurgence and evolution, Willmeng Construction broke ground on Wentworth West 80, an industrial spec building at 8001 W. Buckley Rd., on August 8. Totaling 379,828 square feet, the building will consist of a cross-dock warehouse and office space. It’s another example of how older, antiquated

The approved expansion of the Loop 202 required Dolphin Casting, a subsidiary of Karsten Manufacturing, to relocate from the manufacturing facility it has occupied for more than 30 years. Dolphin Casting provides metal castings for multiple industries and automated process including shell. Starting in March 2017, Willmeng Construction began a

In support of first responders throughout the Fire Department and EMS communities, Willmeng Construction set up an exhibit at the Fire & EMS Leadership Conference & Expo for a second straight year. This year’s conference, hosted by the Arizona Fire Chief’s Association (AFCA) and the Arizona Fire District Association (AFDA)

The September/October issue of AZRE, published by AZ Big Media, consisted of several articles highlighting Willmeng Construction’s activity across the Valley, thought leadership and its support of NAIOP-Arizona. To catch up on what Willmeng is doing in the Valley and what’s coming down the pike, check out the digital issue

Willmeng Construction has finished work at the 98,643-square-foot Falcon Field Business Center in Mesa, which began construction on Nov. 28, 2017. Located at 3110 N. Greenfield Road, the industrial space was constructed by Willmeng Construction, designed by Butler Design Group, and is currently owned and managed by EastGroup Properties, Phoenix. “This site is desirable

The former Kuiper Dairy Farm had 525 cows remaining on the property when it was sold in 2012, making way for the next wave of speculative office construction to take shape along Chandler’s Price Corridor – one of the fastest growing employment hubs in Arizona. The construction of CAZ 5 marks