ASM is a leading supplier of semiconductor process equipment for wafer processing. Throughout Willmeng’s ongoing relationship with ASM, we have completed five renovation projects located at their local Clean Room Center in Phoenix. Such work has included removal and replacement of tools in Class 100 or higher areas.

Located at The Reserve at San Tan, the Orsett owned property is a new 104,000-square-foot concrete tilt office building and is mezzanine ready for up to 168,000 square feet total. This new building is the fourth in the office park and includes CMU accents and a steel entry canopy/trellis with

Flagship Credit is a 40,000-square-foot Class-A Tenant Improvement build out. Improvements included redesigned lobbies, bathrooms, breakrooms, game rooms, kitchen and office space modernized and finished with unique accents.

The project entailed a new metal building with insulated panels, and a built-out office building of approximately 10,000 square feet. The project includes conference rooms, breakrooms, storage space, mailroom functions, four service bays for light vehicle servicing, 12,000-gallon above grade fuel storage tank, shade canopies, secured masonry fencing along the

The Willie Itule project consisted of a 70,000-square-foot warehouse renovation including the addition of 13,000 square feet of new office space. Work also included coordination to accommodate 30,000 square feet of owner provided cooler/freezer installation. Willmeng performed significant work that was required to accommodate repairs and grinding of the existing

The largest local ice manufacturer desired to double their production capabilities. Work required occupied phase building expansion to minimize disruption to Ice King’s operations during construction. Willmeng facilitated the addition of two new ice machines and two new bagging lines. Work included complete replacement of the critical Reverse Osmosis equipment,

Complete renovation of the school’s secondary gymnasium. Work entailed installation of a fire sprinkler system bringing the facility up to fire code. Included full modernization of the facility’s locker rooms, replacement of the sports flooring, bleachers and fire detection equipment. All work was expedited to be performed between spring break

25,000-square-foot renovation of the existing premier Private High School’s Science and Art Center to modernize the facility and bring it to post-secondary standards. The programing for the facility included Science Laboratories, Digital Laboratories, Art Rooms, a Sound Studio, Fabrication Shops for Metal, Wood and Robotics, and all new faculty spaces. The

10,000-square-foot renovation to add additional classrooms, music room and martial arts room. Work consisted of a full-scale tenant improvement in the downtown Phoenix mid-rise urban campus. Additional work included the occupied renovation of several existing classroom areas and modernization of campus restroom facilities. All work was completed between spring break

This facility is a new 13,700-square-foot, four-bay fire and rescue station developed on 3.1 acres of land in southeast Gilbert. The station includes living quarters, exercise room, kitchen, dispatch room, offices, a decontamination room and apparatus space to support up to four engines and/or rescue equipment. The ICF & masonry